If brought to the design table Darby Construction Services will assist in any way requested.

Pre-construction is not always a possibility on a project but when it is an option and a contractor can be brought in early, it usually benefits the project.

Key areas to take advantage of would be:

  • Budgeting
  • Scheduling
  • Phasing plans (where applicable)
  • Samples
  • Mock-ups
  • Review of drawings
  • Detailed take-off
  • Identification of long lead items
  • Pre-purchase of long lead items (if necessary)
  • Pre-qualification of subcontractors
  • Prepare subcontractor RFP
  • Pre-construction punch list
  • Air Conditioning preconstruction traverse readings
  • Value Engineering (if requested/necessary)