Pre-construction is not always a possibility on a project but when it is an option and a contractor can be brought in early, it usually benefits the project.
Key areas to take advantage of would be:
- Budgeting
- Scheduling
- Phasing plans (where applicable)
- Samples
- Mock-ups
- Review of drawings
- Detailed take-off
- Identification of long lead items
- Pre-purchase of long lead items (if necessary)
- Pre-qualification of subcontractors
- Prepare subcontractor RFP
- Pre-construction punch list
- Air Conditioning preconstruction traverse readings
- Value Engineering (if requested/necessary)